Design of mains water, gas, electricity and foul drainage infrastructure to this new build holiday complex utilising timber built, highly insulated cabins.
Providing the main contractor, City Axis, a complete MEPh design for this new build CLT single storey restaurant within Kew Gardens.
Air source heat pumps provide space heating and cooling and primary heat to the hot water system.
25 year old 100% fresh air plant requiring re-specification for a complete refurbishment of fans, filters, heating coils, the installation of run around coils to reduce energy consumption and new DDC controls.
Refurbishment of conference room and boiler plant.
New build car showroom, offices and workshop.
Introduction of AC to 230 refurbished bedrooms together with main plant refurbishment designed to permit continued operation of the hotel.
Installation of comfort cooling, DDC controls and heat recovery ventilation. To enhance energy efficiency and increase customer comfort the existing perimeter electric trench heaters were altered to provide 0-100% output against outdoor temperature.