Multi barn conversions with a new Energy Centre comprising ASHP's with back up oil boiler to serve new dwellings.
Multi barn conversions with a new Energy Centre comprising ASHP's with back up oil boiler to serve new dwellings.
Complete MEPh services design to this refurbished house incorporating new basement area.
MEPh design to the new flats which were built in Latvia using steel cages.
This project was the first of it's kind to be undertaken by Berkeley Homes.
Full MEPh services design to the main house, coach house and pool house.
Services included BMS, wine cooling, UPS back up to the incoming power and a borehole water supply with treatment and filtration.
Complete MEPh services design to this refurbished house incorporating new basement area.
New mechanical services to this major refurbishment including Energy Centre, indoor pool and Klargester sewage treatment unit.
Complete MEPh services design to this refurbished house incorporating new basement area.
Full MEPh design incorporating gas fired boilers linked to individual flat heat interface units.
The system included a gas fired CHP.
The proposed works include the redevelopment of the site including demolition of an existing building and structures and erection of a part 3/16 storey mixed-use development plus basement, providing 357sqm of commercial office floor space (Class B1a) and 231sqm of creative workspace (flexible Class B1/Sui Generis) at ground and basement levels, and 74 residential units at upper levels; communal garden on the 3rd floor; with 6 car parking spaces and cycle parking spaces at basement level
76 apartment canal side development comprising 2 separate blocks above ground with commercial units and below ground parking.
Heating and hot water generated from centralized gas fired boiler plant with gas fired CHP.
Large new build dwelling with internal basement swimming pool.
New build 2 storey private dwelling incorporating a closed loop water to water heat pump, connecting to the River Thames.